Silouette graphic representing Tipperary

Roads and Transport - Latest News

Featured

Temporary Traffic Management on the R-491 Cloughjordan,Co.Tipperary

Temporary Traffic Management on the R-491 Cloughjordan,Co.Tipperary.
From the 16th of October 2023 to the 18th of October 2023 for restoration works.
From 09.00hrs to 19.00hrs for the duration of the works.
The road will be closed for periods during the works and a diversion will be in place.
Stop and Go system will be in place.

12 October 2023

Temporary Traffic Management on the L-2111 Derryhogan, Co.Tipperary.

Temporary Traffic Management on the L-2111 Derryhogan,between Littleton and Glengoogle Co.Tipperary.
From the 12th of October 2023 to the 13th of October 2023 for resurfacing works.
From 07.00hrs to 19.00hrs for the duration of the works.
Local access only,Diversion in place.

10 October 2023

Google Traffic Map

Current Road Congestion
Clonmel Nenagh Thurles Cashel
Clonmel Traffic Flow Nenagh Traffic Flow Thurles Traffic Flow Cashel Traffic Flow
 
Carrick-On-Suir Cahir Tipperary Town Twomileborris
Carrick-on-suir Traffic Flow Cahir Traffic Flow Tipperary Town Traffic Flow Two-mile-borris Traffic Flow

TII Cameras

M7 Nenagh N8 Two Mile Borris M8 Cahir N24 Clonmel Relief Rd
holdingimage holdingimage holdingimage holdingimage

Disclaimer: All images displayed are being generated by https://www.tiitraffic.ie/ traffic camera feed